Also known as: SCR1 (create scrub and open habitat mosaics) is the same action as WD8 in the original Countryside Stewardship (Mid Tier and Higher Tier) and CWD8 in CS Higher Tier (2025 onwards). Defra gives the same piece of work a new code each time a scheme changes, so SCR1, WD8 and CWD8 all refer to it. Payment rates and agreement lengths differ between schemes; the work is broadly the same.
This action’s aim is that there’s a mosaic of scrub, grasses and other flowering plants with:
- scrub cover allowed to develop, and managed so the mosaic is maintained
- a variety of species, heights, and structure
- growing trees and deadwood, where relevant
The purpose of this is to:
- provide pollen and nectar sources for beneficial insects, such as bumble bees, solitary bees and butterflies
- provide food and habitats for birds and mammals
- improve the quality of woodland edges and transitions between other habitats
- protect soils and watercourses by reducing soil erosion
What you must do
You must manage the area entered into this action in a way that can reasonably be expected to achieve this action’s aim, including:
- allowing scrub to regenerate naturally or by planting a variety of native scrub species, or a combination of both, so scrub cover develops on between 10% and 60% of the area
- controlling wild herbivores to allow scrub to develop and establish
- leaving any standing and fallen deadwood in place, if it’s safe to do so
- leaving any mature and veteran trees in place, if it’s safe to do so
- making sure tree guards do not damage growing trees, and removing them once trees are established
You must not:
- cut vegetation, unless it’s to control injurious weeds and invasive non-native species including non-native trees, soft and hard rush, nettles or bracken
- graze with livestock
- apply fertilisers, manures or lime
- apply pesticides, except for herbicides, to weed wipe or spot treat to control injurious weeds, invasive non-native species, nettles or bracken
- plough, cultivate, re-seed, harrow or roll
- release gamebirds
- use supplementary feed for game birds
- carry out drainage works or change existing drainage, without written permission before work starts
When to do it
You must do this action each year of its 3-year duration.
Evidence to keep
You must keep evidence to show what you’ve done to complete this action, such as:
- field operations at a land parcel level and associated invoices
- photographs or other documentation
If it’s not clear that you’ve done this action in a way that could reasonably be expected to achieve its aim, we may ask for this evidence. You must supply the evidence if we ask for it.