Countryside Stewardship Higher Tier

CWT2: Buffer in-field ponds and ditches on arable land

£681 per hectare per year, over 5 years.
CS Higher Tier, 2025 onwards
Payment
£681 per hectare per year
Duration
5 years
Category
Buffer strips

What the action involves

This action’s aim is that there’s a wide grass buffer strip around a pond or ditch that:

  • has an intact grass sward throughout the year, without tracks and compacted areas
  • is left to develop a mix of tussocky grasses, flowering plants and low scrub
  • has minimal poaching by livestock

The purpose of this is to:

  • protect ponds or ditches from nutrient leaching and sediment runoff
  • help improve water quality
  • provide a habitat for wildlife

What you must do

Your Natural England adviser will assess your land. They’ll work with you to adapt and agree the activities you must do to achieve this action’s aim. All mandatory activities will be set out in your agreement document.

To get paid for this action, you must:

  • establish or maintain a 10m to 20m wide grass buffer strip adjacent to the pond or ditch in the first year of your agreement
  • allow tussocky grass and low scrub to develop

You must not:

  • allow scrub to develop on more than half of the pond or ditch margin – the southern side of the pond or ditch must remain open
  • apply fertilisers or manures
  • apply pesticides – you may be able to use herbicides to spot-treat or weed-wipe for the control of injurious weeds, invasive non-native plant species, nettles or other plants if this has been agreed with your Natural England adviser
  • cut except to control the spread of woody growth – you can only cut between September and February

When to do it

You must do this action each year of its duration.

Evidence to keep

You must keep evidence to show what you have done to complete this action. If it’s not clear that you have done this action in a way that could reasonably be expected to achieve its aim, the Rural Payments Agency (RPA) may ask for this evidence.

You must supply the evidence if they ask for it, including:

  • field operations at a land parcel level
  • associated invoices
  • photographs
The same action in other schemes

The same action appears in the other schemes under a different code. The work is broadly the same; the rate and the length of the commitment are not.

  • SFI 2024BFS2: £681 per hectare (ha) per year – calculate the hectarage by: • measuring the length of the buffer strip in metres (m) • multiplying that length by the relevant width (10m to 20m) to give the area in m2 • dividing that ar, over 3 years
Eligibility, land types and admin detail

Where you can do it

You can do this action on eligible land that’s located below the moorland line and adjacent to either:

  • a pond
  • a ditch that’s under: CWT3: Manage ditches of high environmental value in Countryside Stewardship Higher Tier

You cannot do this action:

  • around ponds used for industrial purposes, including effluent and balancing ponds or small water supply reservoirs
  • on historic or archaeological features

Eligible land

You can do this action on land that’s:

  • an eligible land type
  • registered with an eligible land cover on your digital maps
  • declared with a land use code which is compatible with the eligible land cover

Available area

Total or part of the available area in the land parcel.

Rotational or static

This action is static. This means you must do it on the same location each year of the action’s duration.

Consents and permissions

To apply for this action, you’ll need:

  • Scheduled Monument Consent from Historic England for any work on scheduled monuments
  • consent from Natural England for any activity on land designated as a site of special scientific interest (SSSI)

You may need to:

  • agree an implementation plan or feasibility study with your Natural England adviser
  • get advice from your Natural England adviser if you have other historic or archaeological features on your agreement land
  • get a wildlife licence from Natural England if your activities affect a protected species or their habitat

All historic and archaeological features (including scheduled monuments) are identified in your Historic Environment Farm Environment Record (HEFER).

If you’re a tenant, it’s your responsibility to check whether your tenancy agreement allows you to complete what’s required in the actions you choose. You may need your landlord’s consent.

Capital grants that support it

If you need to complete an implementation plan or a feasibility study before you apply, you can apply for capital grants plans funding.

You can also apply for capital items to help you achieve the action’s aims. Your Natural England adviser will discuss eligible capital items with you.

Read the full guidance on GOV.UK

What you can do on the same land

Actions and options you can put on the same area of a land parcel, by scheme.
SFI 2023
CS Higher Tier, 2025+
CS options

OR3, OR4, OT3, OT4

Environmental Stewardship

N/A

SFI Shepherd
Planning around an existing agreement

See how Higher Tier interacts with your SFI plan, before you apply

SFI Shepherd builds an SFI26 application field by field from your RPA maps, and flags clashes with the Countryside Stewardship and SFI agreements a farm already holds. It tracks the 25% limited-area total that CSHT and SFI share across the whole holding, and exports a summary ready for the RPA portal.

Get your Soil, Manure and Nutrient Management Plans done today