Countryside Stewardship Higher Tier

CSW26: Enhanced floodplain storage supplement

£366 per hectare per year, over 5 years.
CS Higher Tier, 2025 onwards
Payment
£366 per hectare per year
Duration
5 years
Category
Waterbodies

What the action involves

The aim of this supplemental action is to increase floodwater storage in floodplains so that they hold more water for longer. You can do this by managing features such as:

  • swales (channels)
  • temporary ponds or depressions

The purpose is to slow the flow of water off floodplains to deliver benefits for flood and drought management.

What you must do

Your Natural England adviser will assess your land. They’ll work with you to adapt and agree the activities you must do to achieve this action’s aim. All mandatory activities will be set out in your agreement document.

To get paid for this action, you must:

  • maintain temporary water storage features
  • remove build-up of sediment, woody debris and non-biological debris after flooding

You must not:

  • apply fertilisers or manures
  • apply pesticides – you may be able to use herbicides to spot-treat or weed-wipe for the control of injurious weeds, invasive non-native plant species, nettles or other plants if this has been agreed with your Natural England adviser
  • allow vehicle access except on agreed routes
  • create new access routes for vehicles

When to do it

You must do this action each year of its duration.

Evidence to keep

You must keep evidence to show what you have done to complete this action. If it’s not clear that you have done this action in a way that could reasonably be expected to achieve its aim, the Rural Payments Agency (RPA) may ask for this evidence.

You must supply the evidence if they ask for it, including:

  • field operations at a parcel level
  • associated invoices
  • photographs relevant to the action
Eligibility, land types and admin detail

Where you can do it

You can do this supplementary action on land with any of the following Countryside Stewardship base actions:

  • CGS26: Manage grassland with very low nutrient inputs
  • CSW7: Arable reversion to grassland with low fertiliser input
  • CSW15: Flood mitigation on arable reversion to grassland
  • CSW16: Flood mitigation on permanent grassland
  • CGS4: Herbal leys
  • CGS25: Legumes on improved grassland

You can only do this action on land that:

  • is in a floodplain and actively floods
  • has water-retaining features by the end of year 1 on at least 20% of the land area covered by the action

Your Natural England adviser will agree with you what other supplemental actions may be needed to meet the intended environmental outcomes. These could include:

  • CGS16: Rush control supplement
  • CGS23: Haymaking supplement
  • CGS24: Haymaking supplement (late cut)
  • CSP1: Difficult site supplement
  • CSP16: Keep native breeds on grazed habitats supplement (50-80%)
  • CSP17: Keep native breeds on grazed habitats supplement (more than 80%)
  • CSP5: Shepherding supplement (non-moorland)
  • CSP6: Cattle grazing supplement (non-moorland)
  • CSP7: Introduction of cattle grazing on the Isles of Scilly supplement
  • CSP9: Support for threatened species

You cannot do this action on a priority habitat.

Eligible land

Same as base action.

Available area

Same or less than the base action.

Rotational or static

Same as base action.

Consents and permissions

To apply for this action, you’ll need:

  • to agree an implementation plan or feasibility study with your Natural England adviser
  • Scheduled Monument Consent from Historic England for any work on scheduled monuments
  • consent from Natural England for any activity on land designated as a site of special scientific interest (SSSI)
  • to obtain any necessary consents from the Environment Agency, Lead Local Flood Authority (LLFA) or Internal Drainage Board (IDB) before starting any work

You may also need to get:

  • advice from your Natural England adviser if you have other archaeological or historic features on your agreement land
  • a wildlife licence from Natural England if your activities affect a protected species or their habitat

All archaeological and historic features (including scheduled monuments) are identified in your Historic Environment Farm Environment Record (HEFER).

If you’re a tenant, it’s your responsibility to check whether your tenancy agreement allows you to complete what’s required in the actions you choose. You may need your landlord’s consent.

Capital grants that support it

If you need to complete an implementation plan or a feasibility study before you apply, you can apply for capital grants plans funding.

You can also apply for capital items to help you achieve the action’s aims. Your Natural England adviser will discuss eligible capital items with you.

Read the full guidance on GOV.UK

What you can do on the same land

Actions and options you can put on the same area of a land parcel, by scheme.
SFI 2026
SFI 2024

No revenue options

SFI 2023

No revenue options

CS Higher Tier, 2025+

No revenue options

CS options

No revenue options

Environmental Stewardship

No revenue options

SFI Shepherd
Planning around an existing agreement

See how Higher Tier interacts with your SFI plan, before you apply

SFI Shepherd builds an SFI26 application field by field from your RPA maps, and flags clashes with the Countryside Stewardship and SFI agreements a farm already holds. It tracks the 25% limited-area total that CSHT and SFI share across the whole holding, and exports a summary ready for the RPA portal.

Get your Soil, Manure and Nutrient Management Plans done today