Countryside Stewardship Higher Tier

CSW23: Manage features on arable land for flood and drought resilience and water quality

£1,241 per hectare per year, over 5 years.
CS Higher Tier, 2025 onwards
Payment
£1,241 per hectare per year
Duration
5 years
Category
Waterbodies

What the action involves

This action’s aim is to reduce runoff from rainwater and store more surface and groundwater in arable land. You can do this by managing features such as sediment traps, bunds, swales and the area surrounding them.

The purpose is to help manage flood risk, improve drought resilience and improve water quality.

What you must do

Your Natural England adviser will assess your land. They’ll work with you to adapt and agree the activities you must do to achieve this action’s aim. All mandatory activities will be set out in your agreement document.

To get paid for this action, you must:

  • maintain and create features to improve water quality and drought resilience (for example removing sediment from sediment traps)
  • remove artificial drainage
  • manage vegetation to maintain surface roughness and maintain an average sward height of 15cm (or taller) throughout the year
  • remove soil compaction before starting work
  • control invasive non-native species

You must not:

  • cut the land for silage or hay – topping to control scrub is allowed during late summer and early autumn to avoid disturbance to ground nesting birds
  • plough or cultivate the area (unless restoring grass species composition or removing compaction)
  • apply fertilisers or manures
  • use the land as access routes for vehicles or livestock
  • apply pesticides – you may be able to use herbicides to spot-treat or weed-wipe for the control of injurious weeds, invasive non-native plant species, nettles or other plants if this has been agreed with your Natural England adviser

When to do it

You must do this action each year of its duration.

Evidence to keep

You must keep evidence to show what you have done to complete this action. If it’s not clear that you have done this action in a way that could reasonably be expected to achieve its aim, the Rural Payments Agency (RPA) may ask for this evidence.

You must supply the evidence if they ask for it, including:

  • field operations at a parcel level
  • associated invoices
  • photographs relevant to the action
Eligibility, land types and admin detail

Where you can do it

You can do this action on eligible land where the landscape, soil and geology provide conditions that benefit flood and drought resilience.

You cannot do this action:

  • in floodplains
  • above the moorland line

Eligible land

You can do this action on land that’s:

  • an eligible land type
  • registered with an eligible land cover on your digital maps
  • declared with a land use code which is compatible with the eligible land cover

Available area

Total or part of the available area in the land parcel (minimum area of 0.25ha).

Rotational or static

This action is static. This means you must do it at the same location each year of this action’s duration.

Consents and permissions

To apply for this action, you’ll need:

  • Scheduled Monument Consent from Historic England for any work on scheduled monuments
  • consent from Natural England for any activity on land designated as a site of special scientific interest (SSSI)
  • to obtain any necessary consents from the Environment Agency, Lead Local Flood Authority (LLFA) or Internal Drainage Board (IDB) before starting any work

You may need to:

  • agree an implementation plan or feasibility study with your Natural England adviser
  • get advice from your Natural England adviser if you have other archaeological or historic features on your agreement land
  • get a wildlife licence from Natural England if your activities affect a protected species or their habitat

All archaeological and historic features (including scheduled monuments) are identified in your Historic Environment Farm Environment Record (HEFER).

If you’re a tenant, it’s your responsibility to check whether your tenancy agreement allows you to complete what’s required in the actions you choose. You may need your landlord’s consent.

Capital grants that support it

If you need to complete an implementation plan or a feasibility study before you apply, you can apply for capital grants plans funding.

You can also apply for capital items to help you achieve the action’s aims. Your Natural England adviser will discuss eligible capital items with you.

Read the full guidance on GOV.UK

What you can do on the same land

Actions and options you can put on the same area of a land parcel, by scheme.
SFI 2023
CS Higher Tier, 2025+
CS options

OR1, OT1

Environmental Stewardship

N/A

SFI Shepherd
Planning around an existing agreement

See how Higher Tier interacts with your SFI plan, before you apply

SFI Shepherd builds an SFI26 application field by field from your RPA maps, and flags clashes with the Countryside Stewardship and SFI agreements a farm already holds. It tracks the 25% limited-area total that CSHT and SFI share across the whole holding, and exports a summary ready for the RPA portal.

Get your Soil, Manure and Nutrient Management Plans done today