What the action involves
This action’s aim is to restore river habitats to create a mosaic of wetland habitats that connect the river and floodplain. This will include:
- varied habitats in the river such as pools, riffles, steep and shallow banks, overhanging trees and large woody material
- erosion of some of the banks with gradual movement of the channel
- a mosaic of changing wetland and drier habitats across the floodplain, such as marsh, fen, wet scrub, woodland and grasslands with areas of standing water, flowing water and bare wet ground
The purpose is to support biodiversity, climate adaptation, flood and drought management.
What you must do
Your Natural England adviser will assess your land. They’ll work with you to adapt and agree the activities you must do to achieve this action’s aim. All mandatory activities will be set out in your agreement document.
To get paid for this action, you must:
- prepare land to create wetland habitats and allow it to receive additional floodwater from adjacent watercourses
- remove or disable any artificial land drainage, such as ditches, drains and pipes – you must agree all drainage works (including modification to existing drainage) in writing with Natural England before carrying out any activities
- establish permanent vegetation cover (as set out in the river restoration plan)
- remove non-biodegradable flood debris
- control invasive non-native species
- only use vehicles on agreed access routes (as set out in the river restoration plan)
The advice you’re given from Natural England is specific to your land which means (where relevant) you may also need to:
- establish a sward by the start of October in the first year of your agreement
- manage the land by cutting and grazing so there is sward that has a range of heights
- manage part of the land by light grazing and keeping a monthly record of stock numbers
- manage part of the land by cutting and removing all cut non-woody material
- retain mature and veteran trees
- retain standing or fallen deadwood unless it’s a flood risk to people and property
- allow trees and scrub to establish on the riverbank and across the floodplain
- remove soil compaction
You must not:
- fill in hollows or wet features
- use supplementary feed for grazing livestock
- remove or control sediments in rivers or floodplains, unless agreed
- carry out earthworks or maintain existing drainage, unless agreed
- apply fertilisers, manures or lime
- plough, cultivate or re-seed except as part of an agreed habitat enhancement programme
- apply pesticides – you may be able to use herbicides to spot-treat or weed-wipe for the control of injurious weeds, invasive non-native plant species, nettles or other plants if this has been agreed with your Natural England adviser
- create new access routes for vehicles
When to do it
You must do this action each year of its duration. You must complete capital works by the date set out in your management plan.
Evidence to keep
You must keep evidence to show what you have done to complete this action. If it’s not clear that you have done this action in a way that could reasonably be expected to achieve its aim, the Rural Payments Agency (RPA) may ask for this evidence.
You must supply the evidence if they ask for it, including:
- field operations at a parcel level
- associated invoices
- photographs relevant to the action
Where you can do it
You can do this action on a river and its floodplain that forms a natural hydrological unit. This means all land on a floodplain where the river naturally flows and floods.
For example, the river and floodplain are not affected by physical modifications such as continuous embankments, river deepening or artificial drainage.
You can only do this action if you have a river restoration plan agreed with Natural England.
You cannot do this action above the moorland line.
Eligible land
You can do this action on land that’s:
- an eligible land type
- registered with an eligible land cover on your digital maps
- declared with a land use code which is compatible with the eligible land cover
Available area
Total or part of the available area in the land parcel.
Rotational or static
This action is static. This means you must do it at the same location each year of this action’s duration.
Consents and permissions
To apply for this action, you’ll need:
- an agreed river restoration plan with your Natural England adviser
- Scheduled Monument Consent from Historic England for any work on scheduled monuments
- consent from Natural England for any activity on land designated as a site of special scientific interest (SSSI)
- to obtain any necessary consents from the Environment Agency, Lead Local Flood Authority (LLFA) or Internal Drainage Board (IDB) before starting any work
You may also need to get:
- advice from your Natural England adviser if you have other archaeological or historic features on your agreement land
- a wildlife licence from Natural England if your activities affect a protected species or their habitat
All archaeological and historic features (including scheduled monuments) are identified in your Historic Environment Farm Environment Record (HEFER).
If you’re a tenant, it’s your responsibility to check whether your tenancy agreement allows you to complete what’s required in the actions you choose. You may need your landlord’s consent.
Capital grants that support it
If you need to complete an implementation plan or a feasibility study before you apply, you can apply for capital grants plans funding.
You can also apply for capital items to help you achieve the action’s aims. Your Natural England adviser will discuss eligible capital items with you.